Every SAP
Basis faced with creating test system with another ID. In that case we must use
BDLS for changing logical names in database tables. The BDLS processing may
take very long time. And increasing the time will depend on the size growth of
the database.
How can we
reduce the BDLS processing time?
For the
answer for this question I have write this article.
So… First
key point is “Test run” option. We
must always perform the changing of logical names in two steps. The first step
is perform with enabled “Test run” option. The test run enables create the
tables list to be converted (remember not all tables must have the converted),
and speed up the real run, because no longer has to check every table. Below,
you may see example pic:
In my case,
“Test run” takes longer time unlike real update mode. After the test run was
completed, you can find in BDLSS the report with tables which to be updated. Now
you can run in real update mode.
Using this
simple method i can change the logical names for four hours, on the system with
size about 5,5 Tb.
But, we can
reduce this time. For this, we must turn to report (BDLSS) and mark the tables
with many rows for update, there we find the column names with existing the
rows for update. With this information we can manually update some tables using
simple SQL expression. Below I explain how you can change the logical names
with manually correction with maximum reduction of time.
Every time
you update the test system, you must change the logical names in the same SAP
tables (not Z tables, their number can change)!!! So, you can create the list
of tables which you want to update using SQL expression. These tables you must
put in exception list, transaction BDLSC:
Now BDLS
will ignore these tables in both mode test and update mode. While BDLS is
running, you can manually update them using SQL. How can you see, is very
simple.
I apologize in advance for my english
I apologize in advance for my english